Electric Vehicle Forums

Electric Vehicle Forums (/forums/)
-   Ford Escape Hybrid (https://electricvehicleforums.com/forums/ford-escape-hybrid-26/)
-   -   Build Out (Final Order Due) / Start Up Dates (https://electricvehicleforums.com/forums/ford-escape-hybrid-26/build-out-final-order-due-start-up-dates-7002/)

SAM Hybrid 04-24-2006 11:14 AM

Build Out (Final Order Due) / Start Up Dates
 
Looks like the 2007 Escape Hybrid production starts on May 1, 2006. Let the games begin.

Dates

Pravus Prime 04-24-2006 12:45 PM

Re: Build Out (Final Order Due) / Start Up Dates
 
Sounds about right. As I recall, I ordered mine last year, as I recall week after next, and was in the front qeue for the '06. So about now should be the '07 production startup.


All times are GMT -7. The time now is 03:20 AM.


© 2024 MH Sub I, LLC dba Internet Brands